New builds, from the plans up.
1 146 units under construction with delivery dates, staged payments and the warranty on file.
- 38Cities
- 24 128Listings
- 1 940Agents
01 / Search
128 developments · 1 146 units under construction
Market
Stage
Stage
02 / Featured development
Sheet A-01
Amorim Desenvolvimento · Lic. PT-4471
Riba Nova
92 apartments over four blocks on the Alcântara waterfront. Escrow-held deposits, ten-year structural warranty, energy class A.
- Delivery
- Q4 2027
- From
- €412k
- Per m²
- €5 240
- Units
- 92
Availability17 of 92 units still available
-
Development
EU
Riba Nova
A-01
Lisbon · Amorim
Structure · 62%
62% built
From€412 000
17 of 92 left
-
Development
EU
Cortile Sette
A-02
Valencia · Grupo Lares
Off-plan · 8%
8% built
From€289 000
61 of 74 left
-
Single unit
EU
Unit 4B · Solar Cais
U-14
Porto · Ventura
Ready to move
Delivered
Asking€645 000
Available
-
Community
US
Bramble Run
A-07
Austin, TX · Halvorsen Homes
Under construction · 74%
74% built
From$486 900
9 quick move-ins
-
Quick move-in
US
3211 Pecan Loop
U-31
Round Rock, TX · Halvorsen Homes
Complete · move-in ready
Delivered
Asking$524 000
Ready now
-
Development
EU
Hafen Zwei
A-09
Rotterdam · Deventer BV
Façade · 88%
88% built
From€368 500
4 of 60 left
-
Development
EU
Praça Velha
A-11
Porto · Ventura
Under construction · 41%
41% built
From€334 000
38 of 55 left
-
Community
US
Cedar Fork
A-13
Austin, TX · Halvorsen Homes
To be built · 5%
5% built
From$429 500
24 lots released
-
Single unit
EU
Unit 12A · Torre Lares
U-22
Valencia · Grupo Lares
Ready to move
Delivered
Asking€398 000
Available
-
Quick move-in
US
1140 Junipero Way
U-38
Round Rock, TX · Halvorsen Homes
Complete · move-in ready
Delivered
Asking$498 000
Ready now
04 / Unit mix
Riba Nova — availability
| Unit | Type | Floor | Area | Terrace | Aspect | Price |
|---|---|---|---|---|---|---|
| A.1.02 | 1 bed | 01 | 54 m² | 8 m² | SouthAvailable | €312 000 |
| A.2.04 | 2 bed | 02 | 78 m² | 12 m² | South / westAvailable | €418 000 |
| A.3.01 | 2 bed | 03 | 81 m² | 14 m² | RiverReserved | €463 000 |
| B.1.03 | 1 bed | 01 | 51 m² | 6 m² | CourtyardSold | €298 000 |
| B.3.02 | 3 bed | 03 | 112 m² | 18 m² | RiverAvailable | €689 000 |
| C.4.01 | 3 bed | 04 | 118 m² | 26 m² | River / penthouseAvailable | €812 000 |
| C.4.02 | 2 bed | 04 | 86 m² | 22 m² | WestReserved | €534 000 |
7 units shown · 4 available · price list rev. 06 / Aug 2026 Request the full price list →
05 / Programme
Construction timeline
-
Q3 2025
Groundworks
Excavation, piling and retaining walls to the north boundary.
Complete
-
Q1 2026
Structure
Reinforced frame to fourth floor, slabs poured block by block.
Complete
-
Q4 2026
Façade
Stone cladding, glazing and terrace balustrades. In progress now.
In progress
-
Q2 2027
Fit-out
Services, joinery, kitchens and the specified finish packages.
Scheduled
-
Q4 2027
Handover
Snagging, habitation licence, notarial deed and keys.
Scheduled
06 / Drawings
Floor plans
Dimensions are structural. Final measurements issued with the notarial deed.
07 / Terms
How you pay for it
EUStaged payment schedule · off-plan
10%
Reservation & promissory contractSigned with the notary, held in escrow
€41 200
20%
Structure certifiedReleased against surveyor's certificate
€82 400
20%
Façade & watertightDue Q4 2026
€82 400
50%
Deed & keysMortgage draws down at completion
€206 000
All instalments are held in escrow and released against the surveyor's certificate. Bank guarantee issued per Law 38/99.
USBuilder incentives · new construction
4.99%
Fixed rate on a 30-year loan through the builder's lender
$12 500
Closing-cost credit on quick move-in homes
$25 000
Design-studio allowance for options and upgrades
2-1
Rate buydown available in the first two years
Incentives apply to quick move-in homes contracted before 30 Sep 2026 and financed through the builder's lender. Run the numbers →
08 / Developers
Who is building
- 01 Amorim DesenvolvimentoLic. PT-4471 Lisbon 9 active 3 140 units 96% on time
- 02 Grupo LaresLic. ES-2208 Valencia 6 active 1 870 units 91% on time
- 03 Halvorsen HomesTX RB-88104 Austin, TX 12 active 4 605 homes 88% on time
- 04 Deventer BVLic. NL-7712 Rotterdam 4 active 980 units 99% on time
- 05 Ventura ConstruçõesLic. PT-3390 Porto 5 active 1 220 units 84% on time
09 / Guide
Buying before it exists
Six checks our legal desk runs on every off-plan file before we let it onto the register. Do the same before you sign.
Legal checks & notary →-
01 · EU
Bank guarantee
Every instalment must be covered by a guarantee or escrow account in your name.
-
02 · Both
Licence on file
Building permit issued, not merely applied for. We publish the number.
-
03 · EU
Habitation licence
Handover cannot legally happen before the licença de utilização is granted.
-
04 · US
Builder warranty
Ten-year structural, two-year systems, one-year workmanship — in writing.
-
05 · Both
Penalty clause
A delay clause with a real number in it, not a vague best-efforts sentence.
-
06 · Both
Finish schedule
The specification annexed to the contract, brand by brand, not 'or similar'.